Safe & Efficient Site Clearing
Eastern Area Locating, LLC saves you major expenses by locating large diameter pipes and high voltage lines rather than damaging them by excavation or other methods. Similarly, some utilities can be extremely dangerous if damaged. Likewise, others can be time-consuming and costly to repair. So, don’t take a chance. Instead, contact Eastern Area Locating, LLC to minimize damage and danger.
The Site Clearing Process
One of our specialties is site clearing to prepare an area before construction. We scan the area using GPR and Radio Frequency Detection. We make multiple passes across the area for the best chance of finding hidden dangers before construction begins.
Discovered Before Excavation?
When underground obstacles are discovered before excavation, contractors should evaluate their location and determine whether the planned work needs to be adjusted. Unexpected buried utilities, pipes, cables, or other structures can interfere with excavation, foundation work, trenching, and site improvements. Proceeding without identifying these obstacles may result in damaged infrastructure, safety hazards, and costly project delays. Ground penetrating radar and radio detection equipment can help identify and mark suspected underground utilities within the proposed work area. Once potential hazards are identified, contractors can review the findings, coordinate with utility owners or appropriate specialists, and modify excavation plans when necessary. Some underground features may require additional investigation or verification before work continues. Addressing these concerns during site preparation helps reduce uncertainty and supports safer construction planning.